Planning projects in Murrumbidgee
20 State significant and State-assessed projects in Murrumbidgee are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Murrumbidgee is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Argoon Wind Farm
Construction and operation of a wind farm with up to 106 wind turbines, battery storage and associated infrastructure.
MurrumbidgeeSSD-64935522
Prepare EIS
Banandra Wind Farm
Development of a wind farm with up to 93 turbines generating up to 558 MW capacity and associated infrastructure
Murrumbidgee+1 moreSSD-132053241
Prepare EIS
Boags Creek Solar Farm
The development of a 300 MW solar farm, energy storage facility and associated infrastructure.
MurrumbidgeeSSD-74997474
Recently assessed or decided
Determination
MOD 1 - Increasing BESS capacity
Increasing the BESS capacity from 50 MW / 100 MW-hours to 200 MW / 400 MW-hours
MurrumbidgeeSSD-8392-Mod-1
Determination
Darlington Point Solar Farm
Development of a 275 MW solar farm and ancillary infrastructure including 100MWh battery energy storage system.
MurrumbidgeeSSD-8392
Determination
MOD 2 - BESS connection and laydown area
BESS connection and laydown area
MurrumbidgeeSSD-8392-Mod-2
Determination
Woodland Battery Energy Storage System
Development of a 200MW/800MWh battery energy storage system with associated infrastructure
MurrumbidgeeSSD-30526266
Determination
Project EnergyConnect (NSW - Eastern Section)
Development of a new transmission line connecting Buronga Substation and Wagga Wagga Substation, and construction of the new Dinawan Substation (170 km west of Wagga Wagga).
Wentworth Shire+8 moreSSI-9172452
Determination
MOD 1 - Extension of Offset Timing
Seeking to extend timing for provision of biodiversity offset package
Wentworth Shire+8 moreSSI-9172452-Mod-1
Determination
Yanco Delta Wind Farm
Development of a wind farm with up to 208 wind turbines, energy storage and associated infrastructure
Edward River+1 moreSSD-41743746
Determination
Coleambally Battery Energy Storage System
Development of a 100MW / 400 MWh Battery Energy Storage System and associated infrastructure
MurrumbidgeeSSD-23368211
Determination
MOD1 - Correct turbine coordinates
Correct errors in turbine coordinates and project disturbance footprint mapping
Edward River+1 moreSSD-41743746-Mod-1
Determination
Dinawan Solar Farm
Development of a 800 MW solar farm, associated infrastructure and battery storage.
MurrumbidgeeSSD-50725959
Determination
Coleambally Solar MOD 1 - Ancillary Areas
Layout changes to include temporary mobile amenities facilities, additional vegetation clearance and changes to the approved ancillary areas.
MurrumbidgeeSSD-8208-MOD-1
Determination
Bullawah Wind Farm
Construction and operation of a wind farm with up to 141 wind turbines and associated infrastructure.
Hay Shire+2 moreSSD-50505215
Assessment
MOD 2 - Worker accommodation facility and infrastructure changes
Addition of an onsite temporary worker accommodation facility, changes to infrastructure, site access and transport routes, increase in disturbance footprint and construction workforce
Edward River+1 moreSSD-41743746-Mod-2
Assessment
Dinawan Wind Farm
Construction and operation of a wind farm with up to 200 wind turbines and associated infrastructure.
Murrumbidgee+1 moreSSD-50725708
Assessment
Victoria to NSW Interconnector West
Development of a new 500kV double circuit transmission lines between the NSW and Victoria border near Murrabit and the new Dinawan substation; and replacement of the existing 330kV transmission line between Wagga substation and new Gugaa substation.
Edward River+3 moreSSI-72887208
Make your yarns count.