Councils

Planning projects in Penrith

321 State significant and State-assessed projects in Penrith are listed on the NSW Planning Portal. 2 are on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.

Open for submissions

  • Closes 17 Nov · 11 days left

    Yiribana Logistics Estate - Warehouses 2 and 4

    Construction of two warehouse and distribution centre buildings with ancillary office space, car parking and hardstand areas, landscaping, minor earthworks, site servicing and signage within the Yiribana Logistics Estate

    PenrithSSD-103574706

  • Closes 24 Nov · 18 days left

    Interlink Distribution Centre

    Approval is sought for the construction and 24‑hour operation of a single warehouse and distribution centre. The development includes an ancillary office, associated car parking, landscaping and hardstand areas.

    PenrithSSD-114570241

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • SEARs

    1066-1094 Mamre Road Industrial Estate

    Construction and operation of a 10 warehouse industrial estate with ancillary offices including civil, stormwater and subdivision works, landscaping and local road construction

    PenrithSSD-152522253

  • Prepare EIS

    1-51 Aldington Road Industrial Estate

    Construction of an industrial estate comprising bulk earthworks, construction of three warehouses and ancillary office space, car parking, estate roads, landscaping, stormwater infrastructure, services and subdivision.

    PenrithSSD-74784709

  • Prepare EIS

    Project Velocity – Precinct 4 (Stage 1)

    The proposed development comprises site-wide preparation works, infrastructure works and subdivision, as well as construction and operation of a warehouse and distribution centre on Lot 1.

    PenrithSSD-129464241

  • Prepare EIS

    819-843 Mamre Road Industrial Estate

    Site-wide earthworks, stormwater infrastructure, site servicing, estate roads, and the construction and operation of four warehouse and distribution centres with ancillary office space, hardstand, car parking, landscaping and signage.

    PenrithSSD-131005492

  • Prepare EIS

    Blaikie Road Spotlight, Jamisontown

    Construction of a mixed-use development comprising warehouse and distribution facilities and large format retail uses, including 18,840m² of warehouse and distribution space, 13,060m² of retail floor space, basement parking, and landscaping.

    PenrithSSD-135697743

  • Prepare EIS

    Burrah Park Stage 2 - Superlot 02a

    Construction of three warehouses and ancillary offices in the Burrah Park estate, with hardstand, car parking, landscaping, on-lot services and infrastructure and signage, with concurrent modification to approved Concept proposal under SSD-70316465

    PenrithSSD-145829990

  • Prepare EIS

    693-711 Luddenham Road Industrial Estate

    Staged bulk earthworks and demolition, subdivision into six lots, construction of roads and stormwater infrastructure and construction and operation of two warehouse buildings with associated office space, car parking, hardstand and landscaping.

    PenrithSSD-101477460

  • Prepare EIS

    Westlink Industry Park - Lot 4

    Construction and 24/7 operation of four warehouse and distribution centre buildings, ancillary office space and a cafe with a total gross floor area of 74,890sqm; earthworks, car parking, hardstand areas, landscaping, infrastructure and signage.

    PenrithSSD-77255706

  • Prepare EIS

    Westlink Industry Park - Lot 5

    Construction and 24/7 operation of two warehouse and distribution centres and ancillary office space with a total gross floor area of 61,140sqm; earthworks, car parking, hardstand areas, landscaping and signage.

    PenrithSSD-77255474

  • Prepare EIS

    200 Aldington Road Industrial Estate - Lot G

    Construction and operation of one warehouse and distribution facility and ancillary office spaces with a total gross floor area of 31,400 square metres, car parking, loading docks, hardstand, landscaping and signage.

    PenrithSSD-100469462

  • Prepare EIS

    1-51 Aldington Road Industrial Estate

    Construction of an industrial estate comprising bulk earthworks, construction of three warehouses and ancillary office space, car parking, estate roads, landscaping, stormwater infrastructure, services and subdivision.

    PenrithSSD-74784709

  • Prepare EIS

    200 Aldington Road Industrial Estate - Lots B, C and A

    Construction and operation of a warehouse and distribution facility on Lot A (WH1 - GFA 2,800 square metres), Lot B (WH2 - GFA 21,595 square metres), Lot C (WH3 - GFA 19,600 square metres). Shared hardstand for loading/unloading, signage, landscaping

    PenrithSSD-100507708

  • Prepare EIS

    Ravenswood Cemetery

    The proposal is for a concept masterplan for a cemetery which would provide for up to 250,000 burial plots

    Liverpool City+1 moreSSD-50748212

  • Prepare EIS

    New Mamre Anglican School

    Construction of a new school in stages, including basement parking, four (4) teaching building blocks, gymnasium, sports fields and playgrounds, play areas and covered outdoor spaces, and associated landscaping.

    PenrithSSD-82956711

  • Prepare EIS

    Aldington Road Data Centre

    PenrithSSD-112059740

  • Prepare EIS

    Shop Top Housing at 186-190 Great Western Hwy

    Construction of a shop top housing development with affordable housing up to 79m in height approximately (22 storeys), including approximately 159 units, basement parking, landscaping, communal open space, tree removal and civil works

    PenrithSSD-152416489

  • Prepare EIS

    Settlers Court Residential flat building

    800 apartments across seven buildings of 6-8 storeys, including 15% affordable housing; stage 1 - 450 apartments

    PenrithSSD-95173708

  • Prepare EIS

    Mixed use and affordable housing - Henry Street

    Demolition of existing building and construction of an infill affordable housing development comprising two 36-storey residential towers (including affordable housing apartments), ground floor retail fronting Henry Street and basement car parking.

    PenrithSSD-71778464

  • Prepare EIS

    SEED Stage 2 Concept Plan and Stage 2A

    A Concept Plan for an industrial estate comprising 10 development lots and a Stage 2A development application for 5 warehouses and distribution centres.

    PenrithSSD-104185710

  • Prepare EIS

    CDC Data Centre Campus, Kemps Creek

    Construction and operation of a data centre campus with a total power consumption of 1.4 GW comprising six two-storey data centre buildings, administration building, substation and Local Collector Road realignment.

    PenrithSSD-133677993

Recently assessed or decided

  • Withdrawn

    St Mary Alternative Waste Technology Facility

    Construction and operation of a Resource Recovery Facility, including an alternative waste technology plant with an associated biofilter, office building and ancillary facilities. Material handling limit of up to 200,000 tpa.

    PenrithSSD-9256

  • Withdrawn

    Mod 2 - Further Design Changes

    PenrithMP09_0220-Mod-2

  • Withdrawn

    Mod 2 - Increase Annual Input

    PenrithMP06_0185-Mod-2

  • Withdrawn

    Mod 4 - Front Fence Relocation

    PenrithMP08_0016-Mod-4

  • Withdrawn

    Mod 3 - Deletion of Boiler Economiser Condition

    PenrithSSD-6026-MOD-3

  • Withdrawn

    Mod 2

    PenrithSSD-6917-MOD-2

  • Withdrawn

    Penrith Glass Plant (Mod 2).

    Glass Recovery Services is seeking modification to amend the design of the external bunkers where glass cullet is currently stored and associated handling and operations

    PenrithSSD-5267-Mod-2

  • Withdrawn

    New STEM School Sydney Science Park Luddenham

    Secondary school (Years 7-12), accommodating approximately 1,140 students within the 'First Community" precinct of Sydney Science Park.

    PenrithSSD-9289

  • Withdrawn

    Employment Lands Rehabilitation Works (Penrith Lakes)

    Rehabilitation of the site to a landform capable of future development.

    PenrithSSD-10403

  • Withdrawn

    Kingswood Private Hospital

    Construction of a new private hospital providing sub-acute and in-patient health care services.

    PenrithSSD-10368

  • Withdrawn

    Glenleigh Eco-Tourist Facility and Function Centre

    Concept and Stage 1 Eco-Tourism and Function Centre development, comprising a new 200 seat function center, 62 eco-tourist cabins, private jetty, adaptive re-use of existing structures, heritage restoration works and infrastructure works.

    PenrithSSD-31017085

  • Withdrawn

    Project Starward - 1030-1048 Mamre Road

    Bulk earthworks and retaining walls, construction and use of three warehouse buildings and ancillary offices and car parking, temporary vehicle access to Mamre Road, stormwater infrastructure, site servicing, landscaping and subdivision

    PenrithSSD-33516329

  • Withdrawn

    Clifton Avenue Resource Recovery Facility

    Construction of a Resource Recovery Facility

    PenrithSSD-9566

  • Withdrawn

    Westlink Industrial Estate - Stage 3

    Construction of two industrial warehouse buildings with ancillary office space, car parking, signage and landscaping, construction of access roads, site clearing and bulk earthworks, site servicing, stormwater infrastructure and subdivision

    PenrithSSD-46983731

  • Withdrawn

    Penrith Stadium Refurbishment

    Refurbishment of Penrith Stadium including demolition of the western stand, new facilities, new amenities and food and beverage offerings, refurbishment of the eastern stand, new stadium entries, activity hub and warm up space on the western field.

    PenrithSSD-64967209

  • Withdrawn

    Burra Park

    Concept proposal and stage one development including bulk earthworks, infrastructure delivery, road access and detailed design of the stage one development for the purpose of a warehouse and logistics estate

    PenrithSSD-18406916

  • Withdrawn

    Burra Park Precinct 2

    Subdivision works including bulk earthworks, road works, stormwater infrastructure and utilities, and construction of a warehouse building on proposed Lot 6.1 with a total gross floor area of approximately 71,164 sqm

    PenrithSSD-49400708

  • Withdrawn

    Mod 5 - ECU

    Installation of a new emission control unit.

    PenrithMP06_0095-Mod-5

  • Withdrawn

    Glenleigh Eco Tourist Facility

    The proposal will include new accommodation, recreation and function spaces to be used as part of the Eco Tourist Facility

    PenrithSSD-66340709

  • Withdrawn

    Modification 2 Nepean River Pump and Pipeline (SSD 5225)

    The Modification Proposal seeks to relocate the Approved Project north-west, 1000m downstream of Penrith Weir. The Proposal seeks to modify the approved pump infrastructure including water pumps, intake and discharge pipework.

    PenrithSSD-5225-Mod-2

  • Withdrawn

    200 Aldington Road Industrial Estate - Lot G

    Construction and use of a warehouse and ancillary workshop and office space, with container hardstand area, car parking landscaping and signage

    PenrithSSD-64583708

  • Withdrawn

    200 Aldington Road Industrial Estate - Lot H

    Construction and operation of four warehouse buildings for manufacturing, cold storage and distribution use, associated office space, car parking, container hardstand, landscaping and signage

    PenrithSSD-64589711

  • Withdrawn

    MOD 1 - Bulk Earthworks Fill Location

    Proposal to amend the approved bulk earthworks to enable excess fill from the excavation for Lot 1 (Warehouse 1) and Lot 4 (Warehouse 4) building pads to be used for the filling of the future Lot 6.

    PenrithSSD-9138102-Mod-1

Search all 321 projects in Penrith

Make your yarns count.

Build a campaign, share with your community, and see the results.