Planning projects in Upper Hunter Shire

28 State significant and State-assessed projects in Upper Hunter Shire are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.

Campaigns running now

  • New England REZ Transmission Project

    New England REZ Transmission Project · closes Thursday 26 November at 11:59 pm

    Write your letter

Open for submissions

  • Closes 26 Nov · 20 days left

    New England REZ Transmission Project

    Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.

    Muswellbrook Shire+6 moreSSI-74175972

Recently assessed or decided

  • Withdrawn

    Liverpool Ranges Rail Duplication

    Liverpool Plains Shire+1 moreSSI-5023

  • Withdrawn

    Scone Abattoir Upgrade

    Upper Hunter ShireSSD-6570

  • Determination

    Mod 3 - Scone Abattoir

    Upper Hunter ShireDA32/95-Mod-3

  • Determination

    Mod 2 - Scone Abattoir

    Upper Hunter ShireDA32/95-Mod-2

  • Determination

    Mod 1 - Scone Abattoir

    Upper Hunter ShireDA32/95-Mod-1

  • Determination

    Scone Abattoir

    Upper Hunter ShireDA32/95

  • Determination

    MOD 1 - Minor Administrative Changes

    Minor administrative changes primarily relating to clarifying timing of post approval documentation.

    Warrumbungle Shire+3 moreSSI-48323210-Mod-1

  • Determination

    MOD 1 - Minor Administrative Changes

    Minor administrative changes primarily relating to clarifying timing of post approval documentation.

    Warrumbungle Shire+3 moreSSI-48323210-Mod-1

  • Determination

    MOD 1 - Turbine and infrastructure changes

    Increase in maximum tip height to 215 m, decrease in maximum number of turbines from 267 to 185, amendments to infrastructure and the transport route and increase native vegetation clearing limits.

    Mid-Western Regional+2 moreSSD-6696-Mod-1

  • Determination

    Kyoto Wind Farm

    Muswellbrook Shire+1 moreMP06_0055

  • Determination

    Bowmans Creek Wind Farm

    Construction and operation of a wind farm with up to 60 wind turbines and associated infrastructure.

    Singleton Shire+2 moreSSD-10315

  • Determination

    MOD 2 - Mudgee Maintenance Facility

    Construction and operation of maintenance facility at 1 Marsh Ave, Caerleon

    Mid-Western Regional+3 moreSSI-48323210-Mod-2

  • Determination

    MOD 2 - Development Corridor Adjustment

    Addition of approximately 16 ha to the development corridor to accommodate micro-siting of access tracks and permanent meteorological monitoring masts

    Mid-Western Regional+2 moreSSD-6696-Mod-2

  • Determination

    MOD 4 - Minor change to clearing limits

    Modification to increase clearing limits for Leucochrysum albicans

    Warrumbungle Shire+3 moreSSI-48323210-MOD-4

  • Determination

    MOD 1 - Lapse Date Extension

    Extension of Project Approval lapse date

    Gunnedah Shire+9 moreMP06_0286-Mod-1

  • Determination

    Queensland-Hunter Gas Pipeline

    Queensland-Hunter Gas Pipeline

    Gunnedah Shire+9 moreMP06_0286

  • Determination

    Liverpool Range Wind Farm

    Mid-Western Regional+2 moreSSD-6696

  • Determination

    MOD 3 - Strategic Offset Delivery Agreement

    Modification to allow the project to meet its biodiversity offset obligation via delivery of a Strategic Offset Delivery Agreement (SODA).

    Warrumbungle Shire+3 moreSSI-48323210-Mod-3

  • Determination

    Hills of Gold Wind Farm.

    A wind farm and associated infrastructure located 50 km south-east of Tamworth and 8 km south of Nundle, comprising up to 70 wind turbines, battery storage and grid connection. IPC link: https://www.ipcn.nsw.gov.au/

    Tamworth Regional+2 moreSSD-9679

  • Determination

    Central-West Orana REZ Transmission

    Development of new twin double circuit 500 kV transmission lines between Wollar and the proposed substations at Merotherie and Elong Elong, and connections from these lines to renewable energy generation and storage projects in the CWO REZ

    Warrumbungle Shire+3 moreSSI-48323210

  • Determination

    MOD 3 - Turbine and infrastructure refinements

    Reduction in maximum number of turbines from 185 to 173, refinements to infrastructure and public road upgrade development corridor.

    Warrumbungle Shire+2 moreSSD-6696-Mod-3

  • Determination

    Liverpool Range Quarry

    A proposed hard rock quarry that would extract, process and transport up to 700,000 tonnes per annum of hard rock material to supply construction material to the approved Liverpool Range Wind Farm (LRWF) Project (SSD-6696).

    Upper Hunter ShireSSD-68063715

  • Determination

    Goulburn River Solar Farm

    Development of a 450 MW solar farm, energy storage and associated infrastructure.

    Upper Hunter ShireSSD-33964533

  • Prepare Mod Report

    MOD 1 - Battery Energy Storage System

    Addition of a Battery Energy Storage System (BESS) and the modifications to sections of the main access route to accommodate OSOM vehicles

    Singleton Shire+2 moreSSD-10315-Mod-1

Search all 28 projects in Upper Hunter Shire