Search results
Showing NSW Planning Portal projects in Wagga Wagga City.
58 projects · page 1 of 5
Assessment
Mangoplah Battery Energy Storage System
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 100MW/400MWh and ancillary infrastructure.
SSD-77527735
Assessment
Wagga Wagga Quarry Mod 2 - Cell 2/3 boundary regularisation
Expansion of the Cell 2/3 extraction boundary to incorporate an area identified as having been extracted beyond the approved boundary following a compliance investigation.
MP07_0069-Mod-2
Assessment
Victoria to NSW Interconnector West
Development of a new 500kV double circuit transmission lines between the NSW and Victoria border near Murrabit and the new Dinawan substation; and replacement of the existing 330kV transmission line between Wagga substation and new Gugaa substation.
+3 moreSSI-72887208
Assessment
Gregadoo Solar Farm MOD 4
Addition of a 200MW/400MWh BESS, additional on-site substation and increase to development footprint area by 5.02ha to include the new access point and track.
SSD-8825-Mod-4
Determination
Teys Abattoir MOD 10 - Alterations to ASRS Building
The proposed modification would involve alterations and additions to the previously approved Auto Sortation and Retrieval System (ASRS) Building, and retention of the existing battery recharge building.
DA220-07-2002-i-Mod-10
Prepare Mod Report
Teys Australian Abattoir MOD 13 - New Site Sheds
Construction of new Site Sheds to house site maintenance staff and equipment.
DA220-07-2002-I-Mod-13
Prepare EIS
Livingstone Solar Farm
Development of a 600 MW solar farm with battery storage and associated infrastructure.
SSD-80114208
Determination
Teys Abattoir MOD 7 - Biofilter Replacement
Teys Australia Wagga Wagga are seeking to modify DA220-07-2002-i for the Beef Abattoir at Bomen to construct a replacement bio-filter and demolition of the existing bio-filter to manage air quality and odour from the operation.
DA220-07-2002-i-Mod-7
Prepare EIS
Gugaa Battery Energy Storage System
Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 1000 MW / 4000 MWh, and ancillary infrastructure.
SSD-103829960
Determination
Teys Abbatoir MOD 9 - Chiller Facility Awning
The proposed modification seeks to construct a 233 square metre awning over an annex of the existing chiller building.
DA220-07-2002-i-Mod-9
Determination
MOD 1 - Extension of Offset Timing
Seeking to extend timing for provision of biodiversity offset package
+8 moreSSI-9172452-Mod-1
Determination
Modification 1 Strategic Offset Delivery Agreement
Modification to allow the project to meet its biodiversity offset obligation via delivery of a Strategic Offset Delivery Agreement (SODA).
+5 moreSSI-36656827-Mod-1