Search results

Showing NSW Planning Portal projects in Wagga Wagga City.

58 projects · page 1 of 5

  • Assessment

    Mangoplah Battery Energy Storage System

    Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 100MW/400MWh and ancillary infrastructure.

    SSD-77527735

  • Assessment

    Wagga Wagga Quarry Mod 2 - Cell 2/3 boundary regularisation

    Expansion of the Cell 2/3 extraction boundary to incorporate an area identified as having been extracted beyond the approved boundary following a compliance investigation.

    MP07_0069-Mod-2

  • Assessment

    Victoria to NSW Interconnector West

    Development of a new 500kV double circuit transmission lines between the NSW and Victoria border near Murrabit and the new Dinawan substation; and replacement of the existing 330kV transmission line between Wagga substation and new Gugaa substation.

    +3 moreSSI-72887208

  • Assessment

    Gregadoo Solar Farm MOD 4

    Addition of a 200MW/400MWh BESS, additional on-site substation and increase to development footprint area by 5.02ha to include the new access point and track.

    SSD-8825-Mod-4

  • Determination

    Teys Abattoir MOD 10 - Alterations to ASRS Building

    The proposed modification would involve alterations and additions to the previously approved Auto Sortation and Retrieval System (ASRS) Building, and retention of the existing battery recharge building.

    DA220-07-2002-i-Mod-10

  • Prepare Mod Report

    Teys Australian Abattoir MOD 13 - New Site Sheds

    Construction of new Site Sheds to house site maintenance staff and equipment.

    DA220-07-2002-I-Mod-13

  • Prepare EIS

    Livingstone Solar Farm

    Development of a 600 MW solar farm with battery storage and associated infrastructure.

    SSD-80114208

  • Determination

    Teys Abattoir MOD 7 - Biofilter Replacement

    Teys Australia Wagga Wagga are seeking to modify DA220-07-2002-i for the Beef Abattoir at Bomen to construct a replacement bio-filter and demolition of the existing bio-filter to manage air quality and odour from the operation.

    DA220-07-2002-i-Mod-7

  • Prepare EIS

    Gugaa Battery Energy Storage System

    Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 1000 MW / 4000 MWh, and ancillary infrastructure.

    SSD-103829960

  • Determination

    Teys Abbatoir MOD 9 - Chiller Facility Awning

    The proposed modification seeks to construct a 233 square metre awning over an annex of the existing chiller building.

    DA220-07-2002-i-Mod-9

  • Determination

    MOD 1 - Extension of Offset Timing

    Seeking to extend timing for provision of biodiversity offset package

    +8 moreSSI-9172452-Mod-1

  • Determination

    Modification 1 Strategic Offset Delivery Agreement

    Modification to allow the project to meet its biodiversity offset obligation via delivery of a Strategic Offset Delivery Agreement (SODA).

    +5 moreSSI-36656827-Mod-1

Make your yarns count.

Build a campaign, share with your community, and see the results.