Withdrawn · SSD-64443210 · Major Project
Upper Hunter South Solar Farm
Construction, operation and decommissioning of a 90MW solar farm, battery energy storage system and associated infrastructure
Project details
- Application
- SSD-64443210
- Status
- Withdrawn
- Type
- State Significant Development
- Council area
- Muswellbrook Shire
- Property
- 1711 Denman Road, Denman
- Development type
- Electricity Generation - Solar
How do you want to help?
Run a campaign for this project
Set up the objections once. Supporters write and lodge their own letters in their own words.
- Unlimited AI help to build and review your campaign
- Invite your team to build it with you
- A public page open to unlimited supporters
Free to set up. $500 when you publish.
Know someone who'd organise this?
Campaigns get far more submissions than individual letters. Send this to a resident group, environment group, or local councillor who could run one.
Just want to object yourself? Lodge on the Planning Portal
Where this project is up to
Withdrawn
This application is no longer going ahead in its current form.
- Last checked on the Planning Portal
- 4 Nov 2026
Other open projects in Muswellbrook Shire
Closes 26 Nov · 20 days left
New England REZ Transmission Project
Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.
Muswellbrook Shire+6 moreSSI-74175972
Prepare EIS
Gelston Battery Energy Storage System
Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 400 MW/1600 MWh, and ancillary infrastructure.
Muswellbrook ShireSSD-104190458
Prepare EIS
Kayuga Solar Farm
Construction, operation and decommissioning of a 80-100MW solar farm, 50MW/100MWh battery energy storage system and associated infrastructure.
Muswellbrook ShireSSD-69489708
Prepare EIS
Muswellbrook Thermal Storage Facility
The Project will include the installation and operation of up to 30 megawatt thermal (MWt) CST facility with the capacity of 4.99 megawatt electrical (MWe) alternating current (AC), onsite grid connection and ancillary infrastructure
Muswellbrook ShireSSD-88560713
Prepare EIS
Edderton Solar Farm
Construction and operation of a 350 MW Solar Farm and associated BESS
Muswellbrook Shire+1 moreSSD-69965958
Prepare EIS
Hunter Vanadium Flow Battery
Construction, operation and decommissioning of a flow battery with a capacity of 108MW / 864MWh and ancillary infrastructure.
Muswellbrook ShireSSD-131053991
How a campaign works
01
Build your campaign
Research the project, frame the objections, and add your own views.
02
Share one link
Get a public campaign page to share with your community.
03
Lodge submissions, fast and easy
Supporters pick the points that apply, add their own views, and lodge in their own words.
04
See what's working
Follow visits, signups, and lodged letters as they come in, and see which channel brings people in.
Make your yarns count.
Build a campaign, share with your community, and see the results.